A complex flooring job on St Ann’s Hospital redevelopment
Designed to transform patient care and staff working conditions, the work on the 74-bed mental health facility involved an extensive redevelopment of the previous wards on the site, and is rated ‘BREEAM Excellent’. Bedford-based flooring contractor, Blade Flooring, was appointed to install the floorcoverings throughout, and turned to ‘trusted supplier’, Bostik, for its technical specifications