£10m electrical infrastructure upgrade at Royal Devon and Exeter Hospital
The project saw the replacement of the hospital’s main low-voltage (LV) and high-voltage (HV) infrastructure and back-up generator systems. Working with 40-year-old infrastructure, principal contractor EX2 developed the design from RIBA Stage 4i to full Construction Stage (RIBA Stage 5). A point cloud survey and Autodesk Revit model of the existing infrastructure enabled early identification … Read more